Way late posting this, but in the days before Christmas I managed to mix up and pour the sills for each of the four door openings.


Side door after the pour.


Back door after it's pour. 


Garage door sills poured and floated. Saved these guys for last after I got my technique down on the smaller doors. 


Left Garage door after curing a few days and the forms stripped off.


Right door as well.


Side door. For all the doors I left a 2" foam buffer between the slab and the sill on all the doors. The top piece is 1" foam, and below it is Fox blocks.


Back door with the forms stripped.