Sunday, December 6, 2015

Got Slab

I had Glenn Sherman from Crow Hill Concrete do the slab pour and finishing for me. They set lines on the walls and set pins in the middle of the floor, and basically eyeballed the pour to get the concrete at the level they wanted.

Here they are working the first corner of the slab, bringing it up to the level marks on the wall. 

After the first truck's worth of concrete they had just about half the slab poured. The rear is thicker, since we slope about 3/4 of an inch per 10' on the front 20' of the slab.

Slab setting up after screed and bull float.




Glenn making one of four or five passes with the power trowel.


Two days later, and the saw cuts for the control joints are in.